• TysonsTunnel.org strongly
supports the extension of Metrorail from
East Falls Church, through Tysons Corner,
to Dulles Airport and beyond.
• The Commonwealth engaged Dulles Transit
partners (Bechtel and Washington Group
International) for Preliminary Engineering
work which includes an Elevated Rail through
most of Tysons.
• The Commonwealth is
now negotiating exclusively with Dulles
Transit Partners for final Design and
Construction work on the project without
competitive bidding. However, it is in
the best interest of our community to
achieve the following:
1. Public, competitive bidding of the
Final Design and Construction work.
2. Simultaneous
consideration of the 3.5 mile tunnel under
Tysons Corner.
3. Side-by-side
competitive bidding of the Tysons Tunnel
and the Elevated
Rail before a final decision is made. |